Stevens County, Washington Spokane & the Inland Northwest

Barndominium Builders in Stevens County, Washington

Stevens County is timber, hay ground and river valley north of Spokane, and nearly every barndominium here goes up on rural acreage with its own well and septic system. That makes the order of approvals matter more than the building itself. The County's Land Services department runs both the planning review and the building permit, and on a new home the planning side comes early: the health district will not treat a septic application as complete until the County's residential site analysis is approved. Northeast Tri County Health District handles the septic system, and in the Colville River watershed a new home on a new exempt well carries a recorded water limit. Barndominium kits suit owners here who want to raise the shell with their own crew over a season, and a pole barn home with a wide equipment bay is a natural fit on working land. If you want one team from site prep to final, our turnkey builds cover it. Towns such as Colville and Chewelah may run their own permits, so tell us where the parcel sits and we will confirm which office applies before anything is drawn.

Stevens County at a glance

County
Stevens County
Building permit
County building department
Land use
County rural and resource zoning
Wastewater
Septic permit from the health jurisdiction
Water
Private well

Barndominium Kits and Pole Barn Homes in Stevens County

A kit suits an owner who wants to raise the shell with their own crew. A pole barn home sets its frame on posts and trusses (the engineering term is post-frame construction) and suits a wide, simple layout with a shop bay under the same roof; a metal building home uses a bolted steel frame. Which one fits your parcel comes down to the zoning, the site and the design values the local building office publishes, covered below.

Building a Barndominium in Stevens County: Permits, Zoning, Septic and Water

On rural land the zoning, septic and water answers often come before the building answer. Here is who decides each part in Stevens County, taken from the office or document that publishes it. Rules change, so check them again against your parcel before anything is drawn.

Who issues the building permit County building department

Stevens County Land Services, Building Division

For unincorporated land, Stevens County Land Services issues building permits through its Building Division, with the Planning Division and Public Works in the same online permit center. Residential site analysis applications go through that portal; other permit forms are submitted offline. Incorporated towns may run their own building programs, so confirm the parcel is outside town limits before applying to the County.

Source: Online Permit Center, Stevens County Land Services and Public Works (co-stevens-wa.smartgovcommunity.com)

Who decides the land use Rural and resource zones

Stevens County Land Services, Planning Division

Rural densities are set in the County's comprehensive plan under the Growth Management Act, and the zoning code fixes lot sizes by zone. For a new house, the Planning Division takes a Residential Site Analysis through the County permit center, and the health district waits for that site analysis approval before it will treat a septic application as complete, so the homesite is settled early.

Source: Online Permit Center, Stevens County Land Services and Public Works (co-stevens-wa.smartgovcommunity.com)

Sewer or septic Septic: local health jurisdiction

Northeast Tri County Health District

Northeast Tri County Health District permits septic systems in Stevens County. It treats an application as complete only once the county planning department's site analysis approval is in and the test holes are ready; a specialist evaluates the soil, then reviews the design, and an installation permit follows, valid three years.

Source: Septic Permit Applications, Northeast Tri County Health District (netchd.org)

Where the water comes from Private well

Washington State Department of Ecology; Stevens County at permit

The Colville watershed, WRIA 59, lies in central Stevens County. In WRIA 59 a new home on a new permit-exempt well pays a $500 fee and has a 3,000 gallons per day annual-average cap, recorded on the title. Ecology's watershed guide notes connecting to an existing water system is usually the fastest option where one serves the land.

Source: WRIA 59 Colville Watershed Water Availability, Washington State Department of Ecology (apps.ecology.wa.gov)

Colville watershed plan
Ecology adopted the updated Colville River watershed plan in June 2020, the first such streamflow plan completed in Eastern Washington. Sixteen projects are meant to offset the effect of new domestic permit-exempt wells on stream flows, which is what keeps rural building on wells possible in the basin.

Source: WRIA 59 Colville Streamflow Plan, Washington State Department of Ecology (ecology.wa.gov)

Health district land review
Northeast Tri County Health District, which serves Stevens, Ferry and Pend Oreille counties, reviews land use proposals with the local planning departments to confirm a site can take an on-site sewage system and that drinking water well locations are protected.

Source: Land Development, Northeast Tri County Health District (netchd.org)

Building on land near Stevens County

Rural parcels here range from open valley hay ground to steep timbered lots, and each type changes the build. Before buying, check whether the parcel falls in the Colville watershed or another basin, because that decides the water rules for a new well. Dig the septic test holes early, since the health district will not treat a septic application as complete until the County's site analysis is approved and the holes are ready. Walk the access road in winter, measure the slope where the shop will sit, and look for creeks, wetlands and shoreline within 200 feet, which bring extra review. On flat, open ground a large pole barn home with an attached equipment bay is straightforward; on a hillside, budget for grading.

Other places in this part of Washington

Spokane & the Inland Northwest

Have land in or near Stevens County? Tell us about the parcel and what you want on it, and we will check it against the local rules before anything is drawn.

Building in Stevens County: questions

Start the survey
How much does it cost to build a barndominium in Stevens County?
Rural site costs set the range as much as the building: a new well and its water limit in the Colville watershed, the septic system the soil evaluation allows, road and driveway work on hilly ground, and bringing power in from the road. Those vary widely from one parcel to the next. Our barndominium cost guide has sourced per-square-foot ranges to start from.
Do I need a building permit for a barndominium in Stevens County?
Yes. On unincorporated land the Stevens County Land Services Building Division issues it, and the Planning Division's residential site analysis comes early because the septic application depends on it. A barndominium lived in as a house is reviewed as a new single-family home. Inside an incorporated town, check with that town first. Our permitting service lines up the site analysis, septic and building steps in order.
Can I drill a well for a new home in Stevens County?
Usually, but the rules depend on the watershed. In the Colville watershed (WRIA 59) and the Little Spokane watershed (WRIA 55), a new home on a new permit-exempt well pays a $500 fee and is limited to a 3,000 gallons per day annual average, recorded on the title. The building permit still needs proof of an adequate water supply. We do not drill wells; a licensed driller does.

Other places near Stevens County

Nearby places with their own pages. Across a city limit or a county line the permit office, the zoning, the septic program and the water rules can change, so each is covered separately.

Building in Stevens County?

Start with the survey. Tell us where the land is and what you want on it, and we will come back with which offices decide it, what the zoning allows, and a plan to fit.