Flat North Sound delta farmland with dark silt fields, a grassed dike and a drainage slough below forested foothills.
Whatcom County, Washington Everett, Bellingham & the North Sound

Barndominium Builders in Whatcom County, Washington

Whatcom County runs from the saltwater shoreline at Bellingham Bay up the Nooksack valley to the foothills of Mount Baker, with farmland and rural acreage between the towns and the international border. Outside the cities, a barndominium usually means two to ten acres, a private well and a septic system, and plenty of room for a shop, hay storage or an equipment bay beside the living space. Whatcom County Planning and Development Services issues building permits for unincorporated land, and the county's Rural zones set how many homes a parcel can carry. The step that surprises most buyers is water: much of the county lies in WRIA 1, the Nooksack River basin with Lake Whatcom and nearby coastal drainages, where a new home on a new permit-exempt well has its own daily limits set by state rule. We build turnkey pole barn homes and steel-framed barndominiums here, supply barndominium kits to owners who plan to raise the shell themselves, and prepare custom plans that place the house, the drainfield and the well radius on the parcel before anything is priced. If the land is inside Bellingham or another city, that city issues the permit instead. Send us the parcel number and we will check the zone, the snow load for its elevation and the water path before you commit.

Whatcom County at a glance

County
Whatcom County
Building permit
County building department
Land use
County rural and resource zoning
Wastewater
Septic permit from the health jurisdiction
Water
Private well

Barndominium Kits and Pole Barn Homes in Whatcom County

A kit suits an owner who wants to raise the shell with their own crew. A pole barn home sets its frame on posts and trusses (the engineering term is post-frame construction) and suits a wide, simple layout with a shop bay under the same roof; a metal building home uses a bolted steel frame. Which one fits your parcel comes down to the zoning, the site and the design values the local building office publishes, covered below.

Building a Barndominium in Whatcom County: Permits, Zoning, Septic and Water

On rural land the zoning, septic and water answers often come before the building answer. Here is who decides each part in Whatcom County, taken from the office or document that publishes it. Rules change, so check them again against your parcel before anything is drawn.

Who issues the building permit County building department

Whatcom County Planning and Development Services (Building Services)

For unincorporated land, Planning and Development Services takes building applications by email or through its online portal and no longer accepts paper. It recommends researching the property's land-use requirements first, and a Site Plan Review ahead of the building permit to fix the house, septic and turnaround locations. Cities and towns inside the county issue their own permits.

Source: Building Services, Whatcom County (whatcomcounty.us)

Who decides the land use Rural and resource zones

Whatcom County Planning and Development Services (zoning, Title 20)

The Growth Management Act leaves rural densities to the county's comprehensive plan, and the zoning code turns them into lot sizes. In the county's Rural District, a conventional subdivision creates lots of two, five or 10 acres depending on the zone (R2A, R5A or R10A) and whether public water is available, and each lot allows one single-family home.

Source: Chapter 20.36 Rural (R) District, Whatcom County Code (ecode360.com)

Sewer or septic Septic: local health jurisdiction

Whatcom County Health and Community Services (Onsite Sewage Program)

Before a building permit, the county health department must approve a septic design based on a soil and site evaluation, with room kept for a reserve drainfield, and that design is drawn on the site plan. Its Onsite Sewage Program oversees nearly 30,000 systems across the county.

Source: Onsite Sewage, Whatcom County (whatcomcounty.us)

Where the water comes from Private well

Whatcom County Health and Community Services; Department of Ecology (WRIA 1 rule)

A building permit needs evidence of an adequate water supply. In WRIA 1, a new home permitted on or after June 27, 2020 on a new permit-exempt well is limited to 500 gallons per day indoors and outdoor watering of 1/12 acre, and the building permit carries a $500 fee. Homes permitted earlier, or using an older well, are not covered.

Source: Nooksack basin rule, Washington State Department of Ecology (ecology.wa.gov)

Well review before the permit
The County's Water Availability packet for a private well asks for a well site inspection, legal water availability documentation, the well log, bacteriological and inorganic chemical tests and a recorded covenant. Wells built after January 19, 2018 need a recorded well covenant before the building permit is issued.

Source: Water Availability Form, Private Water Supply (Well), Whatcom County Health (whatcomcounty.us)

Snow and seismic design
Whatcom County sets snow loads from the Structural Engineers Association of Washington study (revised January 1997), using the site's elevation and isoline, and a plans examiner will look up the value by parcel number. The County places the west half of the county in seismic zone D-1 and the east half in D-0.

Source: Design Loads, Whatcom County (whatcomcounty.us)

Building on land near Whatcom County

Look at three things before buying rural Whatcom land: the zone, the water and the soils. The Rural District's R2A, R5A and R10A designations decide whether a parcel can be split or carry only one house, and farmland in the agriculture zone has its own rules. Water comes next, because the WRIA 1 limits and the county's well review both have to be satisfied before the permit. Then the soils, which set the septic design and where the drainfield and its reserve can go. The County also counts more than 400 miles of shoreline of different types, and a parcel on or near one has extra permitting steps. Snow loads rise with elevation toward the foothills, which affects roof framing on a pole barn home. For city lots with sewer, see Bellingham.

Other places in this part of Washington

Have land in or near Whatcom County? Tell us about the parcel and what you want on it, and we will check it against the local rules before anything is drawn.

Building in Whatcom County: questions

Start the survey
How much does it cost to build a barndominium in Whatcom County?
Rural sites add costs a city lot does not have: drilling and testing a well, a septic system designed for the soils, a driveway and turnaround, and framing for the snow load at your elevation. Those can differ widely between a valley-floor parcel and one in the foothills. For sourced per-square-foot ranges and what moves them, read our barndominium cost guide.
Do I need a building permit for a barndominium in Whatcom County?
Yes. A barndominium that people live in is permitted as a single-family residence. On unincorporated land that is Whatcom County Planning and Development Services, usually after a land-use check and often a Site Plan Review; inside Bellingham, Ferndale, Lynden or another city, that city's building office issues it. We prepare the drawings and handle the submittal through our permitting service.
Can I drill a new well for a barndominium in Whatcom County?
Usually, but plan around the rule. A new home in WRIA 1 on a new permit-exempt well must stay within the indoor and outdoor limits in Ecology's rule and pays a $500 fee with the building permit, and the County reviews the well site, the well log and water tests before it signs off. A lot served by a public water system avoids most of this, so check for one first.
How many acres do I need for a barndominium in rural Whatcom County?
It depends on the zone. The county's Rural District uses two-, five- and ten-acre designations, and the minimum lot size for a new lot also depends on whether public water is available. An existing legal lot can usually take one home. We check the zone on the county parcel map before anything else is decided.

Other places near Whatcom County

Nearby places with their own pages. Across a city limit or a county line the permit office, the zoning, the septic program and the water rules can change, so each is covered separately.

Building in Whatcom County?

Start with the survey. Tell us where the land is and what you want on it, and we will come back with which offices decide it, what the zoning allows, and a plan to fit.